Garden Room extension - horsforth

Mr Newton of Nuton Architecture came to Sms Timber Frame with very detailed designs, requiring a structural solution to fit his needs. 

After working closely with Mr Newton, our timber frame designer managed to provide a solutions without compromising the the designs issued by Mr Newton. 

The timber frame structure and it's components were designed over a course of 4 days. The manufacture of the timber frame components was overlapped with the slab being constructed and meaning that the frame was ready to erect the same day that the slab was finished. The timber frame took 3 days to erect and the client was over the moon with the finished article. 

All following trades commenced work at this stage and the project took Mr Newton around 4 weeks in total to complete. 

Dave Newton Contact

Address: 37 Victoria Gardens, Horsforth, Leeds, LS18 4PJ

Email: dave@nuton.co.uk | www.nuton.co.uk

Tel: 07881 611195

Architectural drawings

 

|completed project|

SMS TIMBER FRAME | UNIT 3 | NEAR BANK | SHELLEY | HUDDERSFIELD | HD88LT | 01484609900